Nanjing Guhua Metalwork Co., Ltd.
You are here: Home » Products » Formwork System » Concrete Slab Formwork

loading

Share to:
sharethis sharing button

Concrete Slab Formwork

NGM-STF 20 is a fast, hand-set floor-slab formwork system which is made up of several basic components. You can form every slab thickness, every layout and every height with STF 20. The system allows for large spans, and this reduces the number of parts that have to be moved. NGM STF 20 thus represents efficient working in any type of requirement.
Availability:
Quantity:
  • STF 20

  • NGM

Guhua Slab Formwork System STF20 Overview

Guhua Slab formwork STF20 is a fast hand-set floor-slab formwork system comprising several basic components and it's capable of forming any slab thickness, layout, and height with large spans to reduce the number of parts needed.

Key Components

NGM_Horizontal_Slab formwork d


A Plywood: Different form-face material and thickness can be chosen to meet your   specific  requirement.


 B H20 timber beam according to the standard.

 C 4-way head.


 D Two-horn head.


 E Tripod used for system stability.

 

 F Steel prop. Different types of props can be chosen telescopic fast operation.




Beam Forming Supporting 20 

NGM_Horizontal_Beam forming supporting formwork d

The Beam forming support 20 is the professional way of forming drop beams and slab stop-ends. In conjunction with the Extension for beam formingsupport 60cm, exact height adjustment to within 1 cm is possible. This does away with time-consuming jobsite squared timber constructions. The Beam forming support automatically clamps the formwork tight, resulting in clean concrete surfaces and grout-tight edges.


Early Dismantling Solution

The Early Dismantling Formwork Solution, when integrated with a slab formwork system, offers a highly efficient and economical approach in construction formwork. This innovative solution is engineered to reduce the amount of formwork needed, while simultaneously increasing the potential for multiple reuse cycles. This design not only accelerates construction processes but also promotes sustainability in project execution. The system's emphasis on minimizing resource use and maximizing efficiency makes it especially valuable for projects where time and cost-effectiveness are key considerations.


Guhua-Early-Dismantling-1  Guhua-Early-Dismantlong-2

Application

NGM_Horizontal_Beam forming supporting formwork g


Previous: 
Next: 

PRODUCTS

Quick Link

FIND US

   Xiongzhou Industrial Park, Luhe District, 
     Nanjing, Jiangsu Province, China
 0086-18551805696
  86-25-57530357
 steven.li@njguhua.com

 

SUBSCRIBE

If you are interested in our products, please contact us.
Copyright © 2023  Nanjing Guhua Metalwork Co., Ltd. All rights reserved.