Introduction
NGM DAM formwork- the formwork system for mass concrete structures
On mass concrete structures, it is not normally feasible to place form-ties through to the opposing formwork. For this reason, the pressure of the fresh concrete has to be transferred into the previous concrete block.
NGM dam formwork ensures that the forces which occur here are transferred safely and reliably.
Products Details
For optimum adaptation to every construction project, NGM offers two different dam formwork systems, both of which always use the same method of working:
Dam formwork DB150 for anchor tensile forces of up to 150 kN
- for block heights of up to 3.0 m
- formwork can be tiltable and retractable
Dam formwork DB220 for anchor tensile forces of up to 220 kN
- for block heights of between 3.0 and 4.0 m
- formwork can be tiltable and retractable
Application
Dams and barrages
Run-of-river power stations
Navigation locks